Pillar sub-scores

A pillar mixes what is endured and what is chosen; a grade is not the average of the pillars.
●●● = documentation available
Energy
EnergyE
●●●●
Water
WaterE
●●●●
Land & biodiversity
Land & biodiversityE
●●●●
Local impact
Local impactE
●●○○
Transparency & governance
Transparency & governance

“Rated E on site; project data insufficient to grade project & process.”

Tracked indicators

IndicatorValueReadingStateSource
Energy
Local grid carbon intensity How much CO₂ is emitted to produce the electricity the site will consume, based on the regional grid. The lower the value, the better. 310 gCO2e/kWh Measured Fictional grid intensity dataset (test) — accessed 2026-07-01
Grid connection capacity / proximity How easily the site can be connected to the power grid: available capacity and distance to the nearest substation. constrained Measured Fictional connection capacity map (test) — accessed 2026-07-01
Grid congestion / connection queue How congested the local grid is: the more saturated, the more the connection competes with other users. high Measured Fictional connection queue registry (test) — accessed 2026-07-01
PUE (announced energy efficiency) The announced energy efficiency: total electricity used versus what actually powers computing. Closer to 1 is better. The lower the value, the better. Not disclosed Missing
Water
Local water stress Water tension in the area: in an already water-scarce region, withdrawals weigh more heavily. high Measured Fictional water restriction registry (test) — accessed 2026-07-01
Water body status The ecological health of the affected river or aquifer, per the EU classification (from 'high' to 'bad'). moderate Measured Fictional water body status report (test) — accessed 2026-07-01
Basin withdrawal pressure How intensively water is already withdrawn from the basin: a heavily-tapped basin ill affords a new user. high Measured Fictional withdrawal database (test) — accessed 2026-07-01
Cooling technology + announced water volume The cooling technology chosen and the water volume it will consume, as announced by the operator. Not disclosed Missing
Land & biodiversity
Overlap / distance to protected areas How close the project is to protected natural areas (Natura 2000, nature reserves…). near_1_to_5km Measured Fictional protected areas layer (test) — accessed 2026-07-01
Soil status (artificialized / natural / agricultural) What the land was before: already built (brownfield), natural, or farmland — sealing farmland or nature weighs most. agricultural Measured Fictional soil status inventory (test) — accessed 2026-07-01
Ecological corridors (TVB) Whether the project severs a wildlife corridor (green-and-blue network). corridor_nearby Measured Fictional ecological corridors layer (test) — accessed 2026-07-01
Project ground footprint The project's ground footprint in hectares: the larger, the greater the land impact. The lower the value, the better. Not disclosed Missing
Avoid-reduce-offset measures / heat recovery Measures to avoid, reduce or offset harm, and to reuse the heat produced. Not disclosed Missing
Local impact
Municipality socio-economic profile The host town's social profile. A safeguard: a project must never improve its grade by locating in a vulnerable town. sensitive Measured Fictional census profile (test) — accessed 2026-07-01
Absorption capacity (project size vs municipality) The project's size relative to the town: a very large project in a small town disrupts more. The lower the value, the better. 1385 MW per 1000 inhabitants Measured Fictional census, municipality population 650 (test) — accessed 2026-07-01
Technological hazard / nearby Seveso sites The presence of hazardous industrial sites (Seveso) nearby, adding risk to the surroundings. seveso_low_within_5km Measured Fictional industrial hazard registry (test) — accessed 2026-07-01
Announced jobs The number of permanent jobs announced, relative to project size. More is better. The higher the value, the better. Not disclosed Missing
Announced tax revenue The tax revenue the project would bring to the town, as announced. Not disclosed Missing
Observed level of opposition The scale of observed opposition: appeals, petitions, mobilizations reported by the press. Not disclosed Missing
Elected officials' position (voted facts only) Elected officials' position as expressed by official votes only (council decisions), with no personal judgment. Not disclosed Missing
Transparency & governance
Consultation / consent / governance (procedural proxies) The quality of the democratic process: public inquiry held, environmental authority opinion, appeals, CNDP referral. Not disclosed Missing
Documentation transparency / file availability How genuinely accessible the project's file is to the public: published studies, figures and commitments. Not disclosed Missing

Operator response

The operator can send us a response about this datasheet. When a response is received and publishable, it appears here, clearly attributed and dated.

A factual error? Use “Report an error”, attaching a source or supporting document.

State of the available data

22 indicators tracked · 12 measured · 0 announced (unverified) · 10 missing.

Grade history

  • Site grade at this dateD
    Project & process grade at this date
    Initial scoring of fictional fixtures on draft methodology (engine bring-up)
  • Site grade at this dateE
    Project & process grade at this date
    Calibration iter-2 (methodology 0.1.0 (h)): base thresholds recalibrated so the site scale can express E — F2 agricultural 25->0 (ENAF category fix), F1/F2 and E1/E2/E3 weight rebalance, W1 high 30->20. Beta (the sparse tier-1-only fixture) moves D 35.0 -> E 30.0.
Methodology 0.1.0 · Scored on 2026-07-09 scoremydatacenter.org