Annotated aerial view of QTS Eemshaven — nouveau bâtiment in Het Hogeland: footprint, watercourse, substation and nearest dwellings, with measured distances.

Probable grade, wide window

This project is not in service: we publish a probable grade C and the range it can still move within B–D. The probable grade is computed on the sourced indicators alone; the range says what the missing ones could still change. It is wider than usual here — that width measures what is missing, not doubt about the calculation. It narrows as the file fills in.

Pillar sub-scores

A pillar mixes what is endured and what is chosen; a grade is not the average of the pillars.
●●●○ = documentation available
Energy
Energy
●●●○

Missing: PUE (announced energy efficiency), Heat-network connectability, Waste-heat recovery — commitment.

Water
Water
●●●○

Missing: Basin withdrawal pressure, Cooling technology + announced water volume.

Land & biodiversity
Land & biodiversity
●●●○

Missing: Ecological corridors (TVB), Site ground footprint, Avoid-reduce-offset (ERC) measures, Designated for urbanisation in a supra-municipal plan, Planning-document compatibility procedure under way.

Local impact
Local impact…
●○○○

1 published indicator only: “Technological hazard / nearby Seveso sites”

Transparency & governance
Transparency & governance–

“Rated C on site, but D on “Energy”.”

This site is among the 97% of the fleet built on already-artificialized soil. Fleet figures →

This site is in Netherlands — the country's site index: C (59.9). See the country index →

Tracked indicators

IndicatorValueReadingStateSource
Energy
Local grid carbon intensity How much CO₂ is emitted to produce the electricity the site will consume, based on the regional grid. The lower the value, the better. 386 gCO2e/kWh Measured Fraunhofer energy-charts.info — NL grid CO2-equivalent intensity, 12-month mean 2025-09-25..2026-09-25 (386.0 gCO2/kWh, n=35091; zone NL) — accessed 2026-09-25
Grid connection capacity / proximity How easily the site can be connected to the power grid: available capacity and distance to the nearest substation. constrained connection capacity Measured Netbeheer Nederland capaciteitskaart (offtake) — Enexis area 'EHAVO Eemshaven-Oost 20 kV', class 1/3: limited transport capacity, no queue; offtake queue 0.124 MW. Class read from the layer's published legend; provisional map to E2/E3 bands — accessed 2026-09-25
Grid congestion / connection queue How congested the local grid is: the more saturated, the more the connection competes with other users. moderate local grid congestion Measured Netbeheer Nederland capaciteitskaart (offtake) — Enexis area 'EHAVO Eemshaven-Oost 20 kV', class 1/3: limited transport capacity, no queue; offtake queue 0.124 MW. Class read from the layer's published legend; provisional map to E2/E3 bands — accessed 2026-09-25
PUE (announced energy efficiency) The announced energy efficiency: total electricity used versus what actually powers computing. Closer to 1 is better. The lower the value, the better. — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Heat-network connectability Whether the site can valorise its waste heat via a district-heating network: distance to the nearest network and presence of a connection obligation (priority development perimeter). — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Waste-heat recovery — commitment Operator commitment level to valorise the site's waste heat (delivered / signed contract / study / intention / none). — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Water
Local water stress Water tension in the area: in an already water-scarce region, withdrawals weigh more heavily. no measured water stress in the area Measured WRI Aqueduct 4.0 baseline water stress at point — 'Low - Medium (10-20%)' (bws_cat 1/4) — accessed 2026-09-25
Water body status The ecological health of the affected river or aquifer, per the EU classification (from 'high' to 'bad'). water body in moderate status Measured EEA WISE spatial (WFD 2022) — nearest water body NL34M113 'NO KUSTPOLDERS' at point + WISE ecological status class 3/5 — accessed 2026-09-25
Basin withdrawal pressure How intensively water is already withdrawn from the basin: a heavily-tapped basin ill affords a new user. — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Cooling technology + announced water volume The cooling technology chosen and the water volume it will consume, as announced by the operator. — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Land & biodiversity
Overlap / distance to protected areas How close the project is to protected natural areas (Natura 2000, nature reserves…). protected natural area 1–5 km away Measured EEA Natura2000Sites (Habitats+Birds combined) — overlap by distance ring (DE2210401, DE2306301, DE2507301, DE2507331) — accessed 2026-09-25
Soil status (artificialized / natural / agricultural) What the land was before: already built (brownfield), natural, or farmland — sealing farmland or nature weighs most. previously developed land Measured PDOK ruimtelijke plannen (enkelbestemming) — bestemmingsplan 'Bedrijventerrein - Industrie' (hoofdgroep bedrijventerrein, NL.IMRO.1966.Eemshaven); Corine cross-check: artificialized — accessed 2026-09-25
Ecological corridors (TVB) Whether the project severs a wildlife corridor (green-and-blue network). Not disclosed — Absent from the file We read the public file and the information is not in it. It counts as a zero in the grade. —
Site ground footprint The SITE's ground footprint in hectares — the land the project takes up (buildings, roads, parking, substation, retention basins), not the building print alone: the larger, the greater the land impact. The lower the value, the better. — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Avoid-reduce-offset (ERC) measures Measures to avoid, reduce or offset harm to soil artificialisation and biodiversity. (Heat recovery moved to E6/E7, Energy pillar.) — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Designated for urbanisation in a supra-municipal plan not scored · contextual fact Is the site designated for urbanisation in a planning document above the municipality? A contextual fact, published as such: it neither improves nor worsens the grade. — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Planning-document compatibility procedure under way not scored · contextual fact Is a procedure under way to make the planning document compatible with the project? A contextual fact: we follow the instrument, not the intention — the land status only changes the day the procedure completes. — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Local impact
Municipality socio-economic profile The host town's social profile. A safeguard: a project must never improve its grade by locating in a vulnerable town. — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Absorption capacity (project size vs municipality) The project's size relative to the town: a very large project in a small town disrupts more. The lower the value, the better. Not disclosed — Absent from the file We read the public file and the information is not in it. It counts as a zero in the grade. —
Technological hazard / nearby Seveso sites The presence of hazardous industrial sites (Seveso) nearby, adding risk to the surroundings. an upper-tier Seveso establishment on record within 2 km Measured REV (Register Externe Veiligheidsrisico's, Rijkswaterstaat) — SevesoInrichting — registre Seveso national qui ÉNUMÈRE (site-de-contrôle A1 validé) : établissement Seveso le plus proche à 0.2 km. Bandes méthodo ≤2km=high / ≤5km=low. — accessed 2026-10-06
Announced jobs The number of permanent jobs announced, relative to project size. More is better. The higher the value, the better. — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Announced tax revenue The tax revenue the project would bring to the town, as announced. — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Observed level of opposition The scale of observed opposition: appeals, petitions, mobilizations reported by the press. Not disclosed — Absent from the file We read the public file and the information is not in it. It counts as a zero in the grade. —
Elected officials' position (voted facts only) Elected officials' position as expressed by official votes only (council decisions), with no personal judgment. Not disclosed — Absent from the file We read the public file and the information is not in it. It counts as a zero in the grade. —
Transparency & governance
Consultation / consent / governance (procedural proxies) The quality of the democratic process: public inquiry held, environmental authority opinion, appeals, CNDP referral. — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —
Documentation transparency / file availability How genuinely accessible the project's file is to the public: published studies, figures and commitments. — — Not looked for yet We have not looked for this yet. It is dropped from the calculation and does not penalise the site. —

Operator response

The operator can send us a response about this datasheet. When a response is received and publishable, it appears here, clearly attributed and dated.

A factual error? Use “Report an error”, attaching a source or supporting document.

State of the available data

26 indicators tracked · 8 measured · 0 announced (unverified) · 4 absent from the file · 14 not looked for yet.

Grade history

Methodology 0.3.0 scoremydatacenter.org