We are not landing on empty ground. The data center industry has measured its performance for years, with a normalized vocabulary and authoritative bodies. This page maps what already exists — the official KPIs, the ISO standards — to situate, by contrast, what we add.

🤓 More advanced than Understanding data centers, upstream of our Method. It is the middle rung: the existing playing field, before our grade.

The map of standards

Who sets authority, and over what. The global backbone is ISO/IEC 30134 (via the SC39 committee); everything else orbits it.

BodyRoleWhat it standardizes
ISO/IEC JTC1 SC39the international committeethe ISO/IEC 30134 series = the official data center KPIs
The Green Gridindustry consortiuminvented the PUE (later adopted by ISO), plus CUE, WUE, and the PI index
ETSItelecom standards (EU)the DCp index (Data Center Performance), an A→I label
CenelecEuropean adoptiontransposes the ISO 30134 standards into Europe
France Datacenter · Gimélec · AGITFrench industrythe KPI white paper (2017): pedagogy, anti-greenwashing
InfraNuminfrastructure federation2025 guide: proximity data centers, sovereignty

The official indicators

The vocabulary the whole sector shares. Almost all of them measure one thing: the efficiency of the machine.

IndicatorStandardWhat it measures
PUEISO/IEC 30134-2the overall energy efficiency of the infrastructure. The flagship metric: 2.0 = the French average, 1.28 = the most recent sites.
REFISO/IEC 30134-3the share of renewable energy consumed
ITEEsvISO/IEC 30134-4 (in progress)the energy efficiency of the server fleet
CUEGreen Gridthe carbon emitted per unit of IT energy
WUEGreen Gridthe water consumed per unit of energy — but machine-side, not territory-side
ERF · COP · CERISO SC39 (in progress)waste-heat reuse, cooling efficiency

Letter grades already exist — but they don't measure the same thing

The industry already has letter grades. The PI (Performance Indicator, The Green Grid) rates a data center from A to G; the DCp (ETSI RGS/OEU-0011) rates it from A to I — like the energy label on a fridge.

But those letters measure the energy efficiency of the infrastructure (PUE, waste-heat reuse, renewables); they are self-declared by the operator, on an anonymous machine. No one puts a letter on the acceptability — water, land, territory, governance — of a named, real site, from the outside.

Same alphabet, radically different dimension. That is precisely the gap we fill.

Where we sit

Our Energy pillar speaks exactly the sector's standardized language — we lean on the standards, we do not bypass them. The A is proven, in fact, by an accredited ISO/IEC 30134 audit.

Our indicatorMatching official KPI
Energy · PUE (declared, graded with caution)PUE — ISO/IEC 30134-2
Energy · real supply (PPA, % renewables)REF — ISO/IEC 30134-3
Energy · carbon intensity (RTE eCO2mix)close to CUE (Green Grid)
Water · WUE / real water sourceWUE (Green Grid)
Land · waste-heat reuseclose to ERF

And here is the difference, by design. The official KPIs are all infrastructure-efficiency metrics. None measures what we grade across four of our five pillars:

  • Water — the water stress of the territory (not the machine's consumption, but the strain on the local resource)
  • Land & biodiversity — artificialized soil, protected areas, ecological corridors
  • Local impact — the town's absorption capacity, Seveso hazard, observed opposition, elected officials' stance
  • Transparency & governance — consultation, consent, public inquiry

The industry optimizes the machine. We grade its acceptability within the territory.

What the state itself examines

Industry KPIs stop at the machine — but public authorities already look at the territory. In the Île-de-France region, where a state approval is mandatory above 5,000 m² of floor area, the regional prefecture published a guidance note on 1 June 2026 setting out, in writing, what it examines in a data-center file. The list maps onto our pillars almost line for line.

What the Île-de-France authorities examineOur indicator
Build on existing business sites and brownfield land — no urban extension where an already-urbanised alternative exists (regional plan, orientations 126, 102 and 85; net-zero-artificialisation trajectory)Land · soil status (artificialised / farmland / natural)
Above 40 MW of grid connection, heightened scrutiny in areas under electrical strain, so the grid keeps capacity for other local needsEnergy · grid connection capacity and queue
20% of the electricity consumed recovered as heat — the level recommended in the dense urban core, to be designed in from the startEnergy · district-heating connectability · announced heat recovery
Particular vigilance over designated water-allocation zones — the Albien, Champigny and Beauce aquifers, la Mauldre, part of le Vexin, la Beuvronne, la Thérouanne and La Bassée — and abstraction limited through the cooling designWater · basin water stress · cooling and announced volume
Opinion of the host local authorities — commitments expected on jobs, training and public facilitiesLocal impact · municipality profile · position of elected officials
PUE, WUE, ISO 14001 and ISO 50001 — plus the European Code of Conduct for Data Centres — to evidence the performance claimedEnergy · PUE · Water · WUE (see the table above)

What this changes for us — and what it does not. These criteria are neither scoring thresholds nor national law: they are the points one French regional prefecture examines, file by file, for one approval. They produce no letter, no comparison between sites, and nothing is published in a form anyone could check one site against another.

That is exactly the boundary. The state assesses case by case and behind closed doors; we measure the same dimensions from the outside, on one grid, across the whole corpus — and we publish them. We grade what the state already looks at: the best answer to anyone claiming these dimensions are our invention.

The industry writes the rule in its white papers. We publish the score — in public, site by site — and we cite its standards to be unassailable, not to be endorsed.

See our method →

← Back to the home page

ScoreMyDataCenter

Independent observatory of data-center acceptability risk.

Engine AGPL-3.0 · Data: licence by source (ODbL, Licence Ouverte…) · Methodology CC BY-SA 4.0
© 2026 Franck Bardol and contributors

Explore

  • Map
  • Ranking
  • Country index
  • Fleet figures
  • Understanding data centers

Resources

  • Methodology
  • Open model
  • Library
  • Developer API
  • FAQ

About

  • Who we are
  • Press
  • Contact
  • Legal notices

Audience measurement: we use Google Analytics to count visits and understand what gets read. No cookie is set without your consent. Learn more