Site portrait
Dalton 4
Whitfield County, Georgia · Core Scientific · under review
Independent observatory
The five pillars behind the grade
- Energy 2 of 6 measures E
- Water 2 of 4 measures B
- Land & biodiversity 2 of 7 measures B
- Local impact 1 of 7 measures ·
- Transparency & governance 0 of 2 measures –
A pillar with no letter rests on too few measures to defend one. We publish the count rather than a letter we could not stand behind.
The points that will decide
Energy
- Grid congestion / connection queue : heavy local grid congestion
- Local grid carbon intensity : 382.1 gCO2e/kWh
To ask for : What PUE is announced, and measured how? to put to the inquiry — a written observation enters the file and requires an answer
Water
- Local water stress : moderate water stress
- Water body status : water body in good status
To ask for : Which cooling technology, and how much water a year? to put to the inquiry — a written observation enters the file and requires an answer
Land & biodiversity
- Overlap / distance to protected areas : no protected natural area on record within 5 km, to our knowledge
- Soil status (artificialized / natural / agricultural) : previously developed land
To ask for : What ground footprint, and on which parcels? to put to the inquiry — a written observation enters the file and requires an answer
What this looks like from the street
Noise — continuous, day and night
Cooling runs permanently and standby generators are tested on a schedule. What is regulated is not a distance but how far the noise rises at the neighbour's.
We hold neither a nearest-dwelling distance nor an acoustic study for this site. Both are obtainable: the study is a document in the file.
Standby generators and their fuel
A facility like this keeps standby generators and the tanks that feed them. They are what gets tested, what gets smelled, and what triggers its own permitting. Their number, their fuel and the volume stored are in the file where one exists.
We measure no health effect and we do not claim to. We publish what is in the file, and what is not.
What we have not measured
- Grid connection capacity / proximitynot yet collected by us
- Heat-network connectabilityverified absent from the file we read
- Basin withdrawal pressurenot yet collected by us
- Ecological corridors (TVB)verified absent from the file we read
- Municipality socio-economic profilenot yet collected by us
- Technological hazard / nearby Seveso sitesnot yet collected by us
- Observed level of oppositionverified absent from the file we read
- Elected officials' position (voted facts only)verified absent from the file we read
These gaps are ours, not the developer's: they say where our measurement stops, and they do not penalise the site.
Where the procedure stands
- announced
- under review
- under construction
- operating
the town or county that zones the land
Any record held by the town, the county or the development agency — impact study, tax-assistance application, acoustic study — is obtained by a request, written or even oral, under the state's public-records law. The deadline: three business days at most. Where only some records are ready, the agency must produce those within the period, and within that same period give a description of the rest and a timeline.
What to get written into the approval
- To ask for : What PUE is announced, and measured how? to put to the inquiry — a written observation enters the file and requires an answer
- To ask for : Will the waste heat be recovered, by whom, and from which phase? to put to the inquiry — a written observation enters the file and requires an answer
- To ask for : Which cooling technology, and how much water a year? to put to the inquiry — a written observation enters the file and requires an answer
- To ask for : What ground footprint, and on which parcels? to put to the inquiry — a written observation enters the file and requires an answer
- To ask for : Which avoidance, reduction and offset measures? to put to the inquiry — a written observation enters the file and requires an answer
- To ask for : Is the land already designated for development in a supra-municipal plan? to put to the inquiry — a written observation enters the file and requires an answer
- To ask for : Does the planning document have to be changed for this project? to put to the inquiry — a written observation enters the file and requires an answer
- To ask for : How many permanent jobs after construction, and of what skill level? to put to the inquiry — a written observation enters the file and requires an answer
- To ask for : What tax revenue for the municipality, over what period, with what abatements? to put to the inquiry — a written observation enters the file and requires an answer
- To ask for : What consultation is planned, on what date, and who answers it? to put to the inquiry — a written observation enters the file and requires an answer
- To ask for : Is the full file open to consultation, where, and until when? to put to the inquiry — a written observation enters the file and requires an answer
Commitments that are not in the approval cannot be enforced: what is not written cannot be demanded later.