Site portrait

TierPoint Boston - Marlborough

Worcester County, Massachusetts · TierPoint, LLC · operating

Independent observatory

Site grade

B

settled grade

Rated B on site, but C on “Energy”.

This page says the same thing as the technical sheet, in the order of a decision to take: what weighs, what is missing, and what is still worth asking for while it can still be asked.

Annotated aerial view of TierPoint Boston - Marlborough: footprint, watercourse and distances
Esri, Maxar, Earthstar Geographics

The five pillars behind the grade

A pillar with no letter rests on too few measures to defend one. We publish the count rather than a letter we could not stand behind.

The points that will decide

Land & biodiversity

  • Overlap / distance to protected areas : protected natural area within 1 km
  • Soil status (artificialized / natural / agricultural) : previously developed land

To ask for : What ground footprint, and on which parcels? to claim from the authority — the site is running, only its operating conditions still bite

Energy

  • Local grid carbon intensity : 244.6 gCO2e/kWh
  • Grid congestion / connection queue : moderate local grid congestion

To ask for : What PUE is announced, and measured how? to claim from the authority — the site is running, only its operating conditions still bite

Water

  • Local water stress : no measured water stress in the area

To ask for : Which cooling technology, and how much water a year? to claim from the authority — the site is running, only its operating conditions still bite

What this looks like from the street

Noise — continuous, day and night

Cooling runs permanently and standby generators are tested on a schedule. What is regulated is not a distance but how far the noise rises at the neighbour's.

We hold neither a nearest-dwelling distance nor an acoustic study for this site. Both are obtainable: the study is a document in the file.

Standby generators and their fuel

A facility like this keeps standby generators and the tanks that feed them. They are what gets tested, what gets smelled, and what triggers its own permitting. Their number, their fuel and the volume stored are in the file where one exists.

We measure no health effect and we do not claim to. We publish what is in the file, and what is not.

What we have not measured

  • Grid connection capacity / proximitynot yet collected by us
  • Heat-network connectabilityverified absent from the file we read
  • Water body statusverified absent from the file we read
  • Basin withdrawal pressurenot yet collected by us
  • Ecological corridors (TVB)verified absent from the file we read
  • Municipality socio-economic profilenot yet collected by us
  • Absorption capacity (project size vs municipality)verified absent from the file we read
  • Technological hazard / nearby Seveso sitesnot yet collected by us
  • Observed level of oppositionverified absent from the file we read
  • Elected officials' position (voted facts only)verified absent from the file we read

These gaps are ours, not the developer's: they say where our measurement stops, and they do not penalise the site.

Where the procedure stands

  1. announced
  2. under review
  3. under construction
  4. operating

the town or county that zones the land

Any record held by the town, the county or the development agency — impact study, tax-assistance application, acoustic study — is obtained by a written request under the state's public-records law. The deadline: ten business days following receipt of the request, and without unreasonable delay.

M.G.L. c. 66, § 10(a)

What to get written into the approval

  • To ask for : What ground footprint, and on which parcels? to claim from the authority — the site is running, only its operating conditions still bite
  • To ask for : Which avoidance, reduction and offset measures? to claim from the authority — the site is running, only its operating conditions still bite
  • To ask for : Is the land already designated for development in a supra-municipal plan? to claim from the authority — the site is running, only its operating conditions still bite
  • To ask for : Does the planning document have to be changed for this project? to claim from the authority — the site is running, only its operating conditions still bite
  • To ask for : What PUE is announced, and measured how? to claim from the authority — the site is running, only its operating conditions still bite
  • To ask for : Will the waste heat be recovered, by whom, and from which phase? to claim from the authority — the site is running, only its operating conditions still bite
  • To ask for : Which cooling technology, and how much water a year? to claim from the authority — the site is running, only its operating conditions still bite
  • To ask for : How many permanent jobs after construction, and of what skill level? to claim from the authority — the site is running, only its operating conditions still bite
  • To ask for : What tax revenue for the municipality, over what period, with what abatements? to claim from the authority — the site is running, only its operating conditions still bite
  • To ask for : What consultation is planned, on what date, and who answers it? to claim from the authority — the site is running, only its operating conditions still bite
  • To ask for : Is the full file open to consultation, where, and until when? to claim from the authority — the site is running, only its operating conditions still bite

Commitments that are not in the approval cannot be enforced: what is not written cannot be demanded later.

↔ Technical sheet — the measures one by one, their values and their sources